Large Scale Non-Battery based Electrical Energy Storage Systems
A tender from UK Industrial Fusion Solutions Ltd.
| Public body | UK Industrial Fusion Solutions Ltd |
|---|---|
| Where | Oxfordshire, South East |
| Value | Not stated in the notice |
| Published | 27 Jan 2026 |
| How it's being bought | The notice doesn't say how it is being bought. |
| Contract | 1 Apr 2029 to 31 Mar 2033 |
Official notice on Find a Tender ↗
Get alerts for tenders like this. Start free and get 7 days of Professional, with job alerts, no card. After that, searching every tender stays free with one weekly job alert; daily alerts are from £19 a month.
Get alerts for tenders like thisSearch all tenders like this
What the notice says
The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. STEP is currently in its Concept Design phase, which is expected to be completed by 2026. The electrical infrastructure of STEP will resemble that of large conventional thermal power stations; however, its design presents unique challenges: Fusion power stations like STEP have exceptionally large parasitic (auxiliary/house) loads required to initiate and sustain fusion reactions—significantly higher than those in conventional power plants. These parasitic loads must be supplied by external sources during plant start-up, before the power generation cycle begins producing electricity. The highly dynamic nature of these loads could make compliance with grid code requirements challenging. For more information, please refer to: Staying positive: producing net power | Philosophical Transactions of the Royal Society A | The Royal Society UKIFS is seeking experts to support the technology selection of a Central Energy Storage System (CESS) that is part of the STEP Electrical infrastructure. Due to the power dynamics of operating the STEP power plant and the operating parameters set by the National Energy System Operator (NESO), an energy storage system is required to provide a mechanism to ensure that we remain within the NESO operating
Past electrical jobs at UK Industrial Fusion Solutions Ltd
The latest of the 2 contracts in this trade it awarded in the last five years, with who won them.
| Contract | Won by | Value | Bids | Awarded |
|---|---|---|---|---|
| Consulting Services on STEP Magnet System | Oxford Quantum Solutions Ltd | £24k | – | 14 Apr 2025 |
| 2G (REBCO-based) HTS Tape Supply Framework for STEP | Furukawa Electric Europe Limited, Shanghai Superconductor Technology Co., Lt | – | – | 10 Apr 2025 |
0 of the 2 electrical contracts UK Industrial Fusion Solutions Ltd awarded in the last five years published a bid count: too few to say what is typical.
Similar open tenders nearby
Open electrical tenders in Oxfordshire and elsewhere in the South East.
More: All of UK Industrial Fusion Solutions Ltd’s tenders · Tenders in Oxfordshire · Tenders in the South East
Tenders and awards from Find a Tender, Contracts Finder, Public Contracts Scotland and Sell2Wales; contracts ending also from councils' own contract registers. Contains public sector information licensed under the Open Government Licence v3.0.