Modern Methods of Construction (MMC) New Homes Framework
A tender from LHC.
| Public body | LHC |
|---|---|
| Where | Caerphilly, Wales |
| Value | £500m at most, across everything bought through it |
| Closed | 14 Oct 2022 |
| Published | 3 Feb 2022 |
| How it was bought | Open to any firm: one stage, and anyone can bid. |
| Lots | 20 (parts you can bid for separately) |
| Won by | Beattie Passive, Connect Modular Ltd., CoreHaus LTD, CCG (Scotland) Ltd, Donaldson Timber Systems |
| Awarded on | 21 Apr 2023 |
| Bids | Not published |
Official notice on Find a Tender ↗
Similar open tenders nearby
This tender has closed. Open tenders like it, in Caerphilly and elsewhere in Wales:
Get alerts for tenders like this. Start free and get 7 days of Professional, with job alerts, no card. After that, searching every tender stays free with one weekly job alert; daily alerts are from £19 a month.
Get alerts for tenders like thisSearch all tenders like this
What the notice says
This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for the construction of Modern Methods of Construction (MMC) New Homes and associated works. The framework consists of 4 (four) workstreams and each workstream has multiple lots. As follows: Workstream 1 - Three Dimensional (3D) Modular Systems - Category 1 Lots 1-7 Workstream 2 - Two Dimensional (2D) Panelised Systems - Category 2 Lots 8-10 Workstream 3 - Main Contractors Delivering MMC Solutions - Lots 11-17 Workstream 4 - Groundworks and Site preparation for MMC Housing Projects - Lot 18 This framework agreement will commence on the 2nd May 2023 and will last for 48 months.
The 20 lots
| Lot | What | Value |
|---|---|---|
| 1 | Lot 1 – 3D Modular Low Rise Housing and Apartments up to 11m - 0 - 9 Units Lot 1 covers low rise volumetric three dimensional units. Volumetric units can be brought to final site in a variety of forms ranging from a basic structure only to one with all internal and external finishes and services installed. This lot encompasses all low rise housing up to 11m in height but… | £500m |
| 2 | Lot 2 – 3D Modular Low Rise Housing and Apartments up to 11m - 10 - 19 Units Lot 2 covers low rise volumetric three dimensional units. Volumetric units can be brought to final site in a variety of forms ranging from a basic structure only to one with all internal and external finishes and services installed. This lot encompasses all low rise housing up to 11m in height but… | £500m |
| 3 | Lot 3 – 3D Modular Low Rise Housing and Apartments up to 11m - 20 - 49 Units Lot 3 covers low rise volumetric three dimensional units. Volumetric units can be brought to final site in a variety of forms ranging from a basic structure only to one with all internal and external finishes and services installed. This lot encompasses all low rise housing up to 11m in height but… | £500m |
| 4 | Lot 4 – 3D Modular Low Rise Housing and Apartments up to 11m - 50+ Units Lot 4 covers low rise volumetric three dimensional units. Volumetric units can be brought to final site in a variety of forms ranging from a basic structure only to one with all internal and external finishes and services installed. This lot encompasses all low rise housing up to 11m in height but… | £500m |
| 5 | Lot 5 - 3D Modular High Rise Housing - 11m or Higher Lot 5 covers Medium to High Rise volumetric three dimensional units. Volumetric units can be brought to final site in a variety of forms ranging from a basic structure only to one with all internal and external finishes and services installed. This lot covers projects for Medium to High rise… | £500m |
| 6 | Lot 6 - 3D Modular Independent & Assisted Housing and Care Homes Lot 6 covers the provision of specialist housing including Care Homes, Extra Care Housing, Sheltered Housing and Assisted Living Housing. Volumetric units can be brought to final site in a variety of forms ranging from a basic structure only to one with all internal and external finishes and… | £500m |
| 7 | Lot 7 - 3D Modular Adaptive Pods Lot 7 covers the requirement for units to provide additional accommodation (Assisted bathrooms/Bedrooms etc for disabled users) as a single storey extension for existing housing units. The internal design and layout will be bespoke to meet the specific end user requirements. | £500m |
| 8 | Lot 8 - 2D Panelised Systems – Supply Only Lot 8 will cover the supply only of panelised systems including systems such as timber, light gauge steel frames and Structural Insulated Panels (SIPS) or other alternatives. Appointed companies will be able to provide: - Basic frames (2a) - Enhanced insulations and lining materials (2b) - Further… | £500m |
| 9 | Lot 9 - 2D Panelised Systems – Installers Lot 9 is for installation panelised systems, such as timber, light gauge steel frames and Structural Insulated Panels (SIPS) or other alternatives by specialist installers. | £500m |
| 10 | Lot 10 - 2D Panelised Systems – Supply and Installation Lot 10 will cover the supply and installation of panelised systems including systems such as timber, light gauge steel frames and Structural Insulated Panels (SIPS) or other alternatives. Appointed companies will be able to provide: - Basic frames (2a) - Enhanced insulations and lining materials… | £100m |
| 11 | Lot 11 - Main Contractors Low Rise Housing and Apartments up to 11m – 0 - 9 Units Lot 11 encompasses all low rise housing up to 11m in height but typically up to 4 storeys high. Appointed Companies will also be able to deliver Adaptive Pods, this will include the pod and all ancillary works required to install and integrate the pod with the existing property This lot is for… | £500m |
| 12 | Lot 12 - Main Contractors Low Rise Housing and Apartments up to 11m – 10 - 19 Units Lot 12 encompasses all low rise housing up to 11m in height but typically up to 4 storeys high. Appointed Companies will also be able to deliver Adaptive Pods, this will include the pod and all ancillary works required to install and integrate the pod with the existing property This lot is for… | £600m |
| 13 | Lot 13 - Main Contractors Low Rise Housing and Apartments up to 11m – 20 - 49 Units Lot 13 encompasses all low rise housing up to 11m in height but typically up to 4 storeys high. Appointed Companies will also be able to deliver Adaptive Pods, this will include the pod and all ancillary works required to install and integrate the pod with the existing property This lot is for… | £500m |
| 14 | Lot 14 - Main Contractors Low Rise Housing and Apartments up to 11m - 50+ Units Lot 14 encompasses all low rise housing up to 11m in height but typically up to 4 storeys high. Appointed Companies will also be able to deliver Adaptive Pods, this will include the pod and all ancillary works required to install and integrate the pod with the existing property This lot is for… | £500m |
| 15 | Lot 15 - Main Contractors High Rise Housing - 11m or Higher Lot 15 covers projects for Medium to High rise developments with floor heights above 11m covering flats/apartments and mixed use projects. This lot is for main contractors who can provide MMC solutions and Principal Contractor services to deliver all scopes of a construction project including… | £500m |
| 16 | Lot 16 - Main Contractors Care Homes and Specialised Housing Lot 16 covers the provision of specialist housing including Care Homes, Extra Care Housing, Sheltered Housing and Assisted Living Housing. This lot is for main contractors who can provide MMC solutions and Principal Contractor services to deliver all scopes of a construction project including… | £500m |
| 17 | Lot 17 - Main Contractors ‘Room on the Roof’ Lot 17 covers the provision of additional residential accommodation on top of an existing building, (this will include the accommodation and all associated works). In addition to the room on the roof accommodation, refurbishment and energy efficiency measures may need to be provided to the… | £500m |
| 18 | Lot 18 - Groundworks and Associated Works Lot 18 is for the provision of Groundworks and associated services encompassing: - Ground Works - Civil Engineering and Drainage - Roadworks and S278 Works - Site Setup and enabling works - Hard landscaping - Geotechnical and exploratory ground investigation and surveys - Remediation - Drainage … | £500m |
| 19 | Lot 19 – Workstream 1 3D Modular Low Rise Housing Super Lot Following the evaluation process all companies appointed to one or more of the low rise housing lots 1-4 will be automatically added to the respective superlot. The super lot can be used for call off opportunities where one of the following criteria applies: - A client does not receive a suitable… | £500m |
| 20 | Lot 20 - Main Contractors Low Rise Housing Super Lot Following the evaluation process all companies appointed to one or more of the main contractors low rise housing lots 11-14 will be automatically added to the respective superlot. The super lot can be used for call off opportunities where one of the following criteria applies: - A client does not… | £100m |
Past building works & refurbishment jobs at LHC
The latest of the 5 contracts in this trade it awarded in the last five years, with who won them.
| Contract | Won by | Value | Bids | Awarded |
|---|---|---|---|---|
| Public Buildings Construction and Infrastructure | Not named | – | – | 2 Oct 2026 |
| Refurbishment and Modernisation Framework Agreement | A&E Elkins Ltd, trading as Elkins Construction, Amber Construction Services Ltd | – | – | 20 Feb 2024 |
| Refurbishment and Modernisation Framework Agreement | Arc Group London Ltd, Etec Contract Services Ltd | – | – | 20 Feb 2024 |
| New Build Housing Construction Framework | AR Demolition Limited, ARJ Construction Limited | – | – | 5 Sep 2022 |
| New Build Housing Construction Framework | Sovini Construction Limited, R.G. Carter Cambridge Limited | – | – | 2 Sep 2022 |
0 of the 5 building works & refurbishment contracts LHC awarded in the last five years published a bid count: too few to say what is typical.
LHC's building works & refurbishment contracts ending soon
With who holds them now, over the next 18 months.
| Contract | Held by | Value | Ends |
|---|---|---|---|
| 52+ Homes for Magna Housing Limited | Rollalong Limited | – | 30 Nov 2026 |
| Refurbishment and Modernisation Framework Agreement | A&E Elkins Ltd, trading as Elkins Construction, Amber Construction Services Ltd | £210m | 29 Feb 2028 |
More: All of LHC’s tenders · Tenders in Caerphilly · Tenders in Wales
Tenders and awards from Find a Tender, Contracts Finder, Public Contracts Scotland and Sell2Wales; contracts ending also from councils' own contract registers. Contains public sector information licensed under the Open Government Licence v3.0.