Groundworks, roads & drainageAwarded

High Speed Two (HS2) Limited, Phase Two - Framework Agreement for Phase Two Route Wide Ground Investigation

A tender from HS2.

Public bodyHS2
WhereBirmingham, West Midlands
Value£300m at most, across everything bought through it
Closed19 Aug 2021
Published8 Jul 2021
How it was boughtNegotiated: the buyer negotiates with the firms it shortlists.
Lots2 (parts you can bid for separately)
Won byAECOM Limited, BAM Nuttall Ltd (TA BAM Ritchies), Fugro GeoServices Ltd, Geotechnical Engineering Limited, RPS
Awarded on7 Sep 2023
BidsNot published

Official notice on Find a Tender ↗

Similar open tenders nearby

This tender has closed. Open tenders like it, in Birmingham and elsewhere in the West Midlands:

Get alerts for tenders like this. Start free and get 7 days of Professional, with job alerts, no card. After that, searching every tender stays free with one weekly job alert; daily alerts are from £19 a month.

Get alerts for tenders like thisSearch all tenders like this

What the notice says

High Speed Two (HS2) Limited has awarded a Framework Agreement for the Phase Two Route Wide Ground Investigation (separated into 2 Lots). Lot 1 for the management and co-ordination of the packaging of GI works as well as the planning and implementation of GI site enabling works (Ground Investigation Partner (GIP)). Lot 2 for the acquisition of geotechnical, hydrogeological and geo-environmental data through surveys, the excavation and detailed logging of exploratory holes, and in-situ and laboratory testing, culminating in the production of factual reports (Ground Investigation Contractor (GIC)), some land of which will be in areas of historic mining. Ground Investigations may also be required and called off under the Framework Agreement as optional scope at other HS2 sites or by Contracting Bodies other than HS2 Ltd (see VI.3 below).

The 2 lots

LotWhatValue
1Lot 1- Ground Investigation Partner (GIP)
Lot 1 is for the appointment of a single Ground Investigation Partner (GIP) to undertake the management and co-ordination of the packaging of GI works as well as the planning and implementation of GI site enabling works across the Phase Two route. The Framework Agreement has a duration of 8 years…
£85m
2Lot 2 - Ground Investigation Contractor (GIC)
HS2 Ltd has appointed 8 Contractors to Lot 2 which is for the acquisition of geotechnical, hydrogeological and geo-environmental data through surveys, the excavation and detailed logging of exploratory holes, and in-situ and laboratory testing, culminating in the production of factual reports…
£215m

Past groundworks, roads & drainage jobs at HS2

The latest of the 5 contracts in this trade it awarded in the last five years, with who won them.

ContractWon byValueBidsAwarded
Railway Systems Procurement for the HS2 Project Third Party Telecommunications SystemsHitachi Rail GTS UK Limited and Telent Technology Services Limited Joint Venture–723 Jan 2025
High Speed Two (HS2) Limited, Overhead Catenary SystemColas Rail Limited–47 Jan 2025
Railway Systems Procurement for Control, Command, Signalling and Traffic Management (CCS and TM) systemsSiemens Mobility Limited–620 Dec 2024
Route-Wide Ground Investigations: Lot 1 - Ground Investigation Partner (GIP)AECOM Limited––7 Sep 2023
Route-Wide Ground Investigations: Lot 2 - Ground Investigation Contractor (GIC)BAM Ritchies (a division of BAM Nuttall Ltd), Fugro Geoservices Limited––7 Sep 2023

3 of the 5 groundworks, roads & drainage contracts HS2 awarded in the last five years published a bid count: too few to say what is typical.

More: All of HS2’s tenders · Tenders in Birmingham · Tenders in the West Midlands

Tenders and awards from Find a Tender, Contracts Finder, Public Contracts Scotland and Sell2Wales; contracts ending also from councils' own contract registers. Contains public sector information licensed under the Open Government Licence v3.0.