Fire Safety Framework
A tender from LHC Procurement Group for the Scottish Procurement Alliance (SPA).
| Public body | LHC Procurement Group for the Scottish Procurement Alliance (SPA) |
|---|---|
| Where | Scotland |
| Value | £20m at most, across everything bought through it |
| Closed | 10 Aug 2023 |
| Published | 20 Feb 2023 |
| How it was bought | Open to any firm: one stage, and anyone can bid. |
| Lots | 11 (parts you can bid for separately) |
| Won by | FCS-live Ltd, Global HSE Solutions Ltd, Momentum 4 Ltd, Oakleaf Surveying Limited, Tersus Consultancy Limited |
| Awarded on | 2 Apr 2024 |
| Bids | Not published |
Official notice on Find a Tender ↗
Similar open tenders nearby
This tender has closed. Open tenders like it, in Scotland:
Get alerts for tenders like this. Start free and get 7 days of Professional, with job alerts, no card. After that, searching every tender stays free with one weekly job alert; daily alerts are from £19 a month.
Get alerts for tenders like thisSearch all tenders like this
What the notice says
This framework covers the geographical area of England and has been procured on behalf of: - Scottisch Procurement Alliance (SPA) This new framework replaces our previous Fire Safety framework and extends the scope to include waking watch services, active fire protection, fire suppression and cladding remediation. The framework consists of 8 (eight) workstreams and some workstreams have multiple lots. As follows: - Lot 1a - Fire Safety Consultancy - Lot 2a - Fire Risk Assessments and Fire Safety Inspections - Lot 3a - Waking Watch Services - Lot 4a - Installation, Maintenance & Remediation of Passive Fire Protection - Lot 5a - Installation of Active Fire Protection - Lot 5b - Active Fire Protection Testing, Servicing and Maintenance - Lot 6a - Installation of Fire Suppression Systems - Lot 6b - Fire Suppression System Testing, Servicing and Maintenance - Lot 7a - Cladding Remediation - Lot 8a - Multi-Disciplinary - Installation of Passive, Active and Fire Suppression Measures - Lot 8b - Multi-Disciplinary - Testing, Servicing and Maintenance of Passive, Active and Fire Suppression Measures
The 11 lots
| Lot | What | Value |
|---|---|---|
| 2 | Fire Risk Assessments The purpose of this Fire Risk Assessment lot is to advise LHC clients on identifying fire hazards, identifying individuals at risk, providing a method to evaluate, remove or deduce the risks of fire, recording the findings and providing appropriate actions. The scope of this lot will cover: Fire… | – |
| 1 | Fire Consultancy This consultancy lot delivers knowledge and advice on all aspects of fire safety including, fire safety legislation, active, passive and suppression systems to ensure safety and guide LHC clients with the formulation and reviewing fire risk assessments. The scope of this consultancy lot includes… | – |
| 3 | Waking Watch The waking watch service consists of suitably trained individuals who will continually patrol the interior and exterior areas of a building in order to ensure early detection of a fire and where necessary raise the alarm and ensure safe evacuation of the building. The core responsibilities of the… | – |
| 4 | Installation of Passive Fire Protection The Passive Fire Protection workstream is constructed to cover the specific items of fire protection that are typically installed in a building to protect the structural integrity of the building, limit the spread of fire and limit/control smoke spread. The scope of this lot includes the design… | – |
| 5 | Installation of Active Fire Protection This workstream covers the design, installation and commissioning of a range of active fire protection measures as necessary to achieve fire safety compliance and current and future applicable fire safety legislation, (currently the Fire Safety Order 2005) and their associated British Standards. … | – |
| 6 | Active Fire Protection Testing, Servicing and Maintenance This lot covers the servicing, repair and maintenance of a range of active fire protection measures as necessary to ensure the Client's active fire safety systems are maintained in effective working order and free of fault and to ensure compliance with applicable fire safety legislation and… | – |
| 7 | Installation of Fire Suppression Systems This workstream covers the design, installation and commissioning of a range of fire suppression measures typically installed in a building to limit the spread of fire and to limit / control smoke spread, to achieve fire safety compliance and current and future applicable fire safety legislation… | – |
| 8 | Fire Suppression System Testing, Servicing and Maintenance This workstream covers the testing, servicing and maintenance of a range of fire suppression measures typically installed in a building to limit the spread of fire and to limit / control smoke spread, to achieve fire safety compliance and current and future applicable fire safety legislation… | – |
| 9 | Cladding Remediation The purpose of this cladding remediation lot is to provide LHC clients with a route to confirm the requirement to conduct remedial works to the external wall system (EWS) of a residential building, and subsequently carry out replacement or remediation of existing external cladding systems. | – |
| 10 | Multi-Disciplinary - Installation of Passive, Active and Fire Suppression Measures The purpose of this multi-disciplinary lot is to provide LHC clients with a route to approved contractors who can cover multiple services that cover the installation of passive, active or suppression fire measures either via direct labour or via sub-contractor where they will act as principal… | – |
| 11 | Multi-Disciplinary - Testing, Servicing and Maintenance of Passive, Active and Fire Suppression Measures The purpose of this multi-disciplinary lot is to provide LHC clients with a route to approved contractors who can cover multiple services that cover the service, maintenance and reactive support of passive, active or suppression fire measures either via direct labour or via sub-contractor where… | – |
Past fire safety & alarms jobs at LHC Procurement Group for the Scottish Procurement Alliance (SPA)
The latest of the 3 contracts in this trade it awarded in the last five years, with who won them.
| Contract | Won by | Value | Bids | Awarded |
|---|---|---|---|---|
| Award of WEST GRANTON HOUSING C0-0PERATIVE - FORTHQUARTER FIRE ALARM UPGRADE REF: WG/SPA/FS2/52377 | OpenView Security Solutions Limited | £129k | 2 | 22 Jan 2026 |
| Award of PERTH & KINROSS COUNCIL FIRE SAFETY WORKS REF PK/SPA/FS2/49344 | Qualifire Limited | £52k | 4 | 2 Jun 2025 |
| Award of KINGDOM HOUSING ASSOCIATION- FIRE SAFETY SERVICING AND MAINTENANCE REF: KH/SPA/WHDPS/51352 | VWS Ltd | £84k | 1 | 4 Mar 2025 |
3 of the 3 fire safety & alarms contracts LHC Procurement Group for the Scottish Procurement Alliance (SPA) awarded in the last five years published a bid count: too few to say what is typical.
More: All of LHC Procurement Group for the Scottish Procurement Alliance (SPA)’s tenders · Tenders in Scotland
Tenders and awards from Find a Tender, Contracts Finder, Public Contracts Scotland and Sell2Wales; contracts ending also from councils' own contract registers. Contains public sector information licensed under the Open Government Licence v3.0.