Supplies & equipmentAwarded

1NextGen Electrolysis - Blending Equipment

A tender from Wales & West Utilities Limited.

Public bodyWales & West Utilities Limited
WhereNewport, Wales
ValueNot stated in the notice
Closed6 Dec 2024
Published6 Nov 2024
How it was boughtTwo stages: firms apply first, then a shortlist is invited to bid.
Contract1 Jan 2025
Lots2 (parts you can bid for separately)
Won byNot named in the notice
Awarded on8 Oct 2025
BidsNot published

Official notice on Find a Tender ↗

Similar open tenders nearby

This tender has closed. Open tenders like it, in Newport:

Get alerts for tenders like this. Start free and get 7 days of Professional, with job alerts, no card. After that, searching every tender stays free with one weekly job alert; daily alerts are from £19 a month.

Get alerts for tenders like thisSearch all tenders like this

What the notice says

WWU require a supplier to design and install a hydrogen blending unit and associated equipment to blend up to a maximum of 20% hydrogen by volume into the customers' existing natural gas supply. The injection will take place downstream of the meter where the end use is combustion to provide heat to the customers existing process. The customer process is non-interruptible and should the blend ratio go above the maximum allowable or if there is any failure of the hydrogen supply the blending infrastructure must be able to revert to 100% natural gas in order to maintain supply to the customer. The blending infrastructure will need to be able to meet the requirements set out in the scope. These requirements are taken from the recently published FUNCTIONAL SPECIFICATION FOR HYDROGEN BLENDING INFRASTRUCTURE a copy of which can be found in Appendix 1 in the scope. WWU will own and operate the hydrogen blending unit and any associated equipment which will be located at the customers site in line with Model 2 in the functional blending spec.

The 2 lots

LotWhatValue
1Equipment Supply only
Blending equipment Natural gas inlet: Pressure: 75 mbar inlet, Temp: -5 to 40 C, Max consumption: Daily - 25384.11 kWh, Max consumption: ½ Hourly - 1191.88 kWh, Mean consumption: Daily - 20175.21 kWh, Mean consumption: ½ Hourly - 435.96 kWh Hydrogen: Max H2 production: 45scmh (4.5kgH2/hr)…
–
2Equipment Supply & Install Complete
Connect electrolyser to inlet of blending equipment via designed pipework. Connect existing natural gas pipework into blending equipment inlet. Connect blending equipment outlet to the customers' existing gas service , downstream of the meter Carry out all civils for the Hydrogen blending…
–

Past supplies & equipment jobs at Wales & West Utilities Limited

The latest of the 4 contracts in this trade it awarded in the last five years, with who won them.

0 of the 4 supplies & equipment contracts Wales & West Utilities Limited awarded in the last five years published a bid count: too few to say what is typical.

Wales & West Utilities Limited's supplies & equipment contracts ending soon

With who holds them now, over the next 18 months.

ContractHeld byValueEnds
Supply and Delivery of Steel Pipe for Natural GasNot named£1.1m30 Apr 2027
Supply of Steel Fittings to B12 SpecificationNot named£445k30 Apr 2027