NEPO210 Highways Surfacing Works
A tender from The Association of North East Councils Limited.
| Public body | The Association of North East Councils Limited |
|---|---|
| Where | Gateshead, North East |
| Value | £500m at most, across everything bought through it |
| Closed | 28 Jul 2025 |
| Published | 17 Apr 2025 |
| How it was bought | Open to any firm: one stage, and anyone can bid. |
| Contract | 1 Nov 2025 to 31 Oct 2033 |
| Lots | 18 (parts you can bid for separately) |
| Won by | Applebridge Construction Limited, Dsd Construction Limited, Hanson Quarry Products Europe Limited, Hillhouse Quarry Group Limited, Holcim UK Limited |
| Awarded on | 8 Oct 2025 |
| Bids | Not published |
Official notice on Find a Tender ↗
Similar open tenders nearby
This tender has closed. There are no open groundworks, roads & drainage tenders in Gateshead and elsewhere in the North East right now.
Get alerts for tenders like this. Start free and get 7 days of Professional, with job alerts, no card. After that, searching every tender stays free with one weekly job alert; daily alerts are from £19 a month.
Get alerts for tenders like thisSearch all tenders like this
What the notice says
The Association of North East Councils Ltd, trading as the North East Procurement Organisation (NEPO), has established a multi-contractor, multi-lot Framework Agreement for the provision of Highways Surfacing Works. This Framework provides Contracting Authorities with access to a wide range of Suppliers capable of delivering specialised highways surfacing services. The Framework is structured into 16 lots, designed to cover the diverse requirements of Contracting Authorities across the North East and the wider UK. The works covered in the Framework have been split into the following lots: 1 Asphaltic Concrete 2 Grouted Macadam 3 Surface Dressing 5 Hot Applied High Friction Surfacing 6 Cold Applied High Friction Surfacing 7 Slurry Seal of Footways 8 Slurry Seal / Micro Asphalt of Carriageways 9 Carriageway in Full Depth Recycling 10 Carriageway Re-tread 11 Captive Shot Blasting - Mechanical Retexturing 12 Hydro blasting - Surface Retexturing 13 Patching 14 Alternative Patching Methods: Hot Applied 15 Alternative Patching Methods: Cold Applied 16 Road Markings 17 Surface Preservation: Penetrative The scope of works includes, but is not limited to: Supply and delivery of Highways Surfacing Works. Execution of works to the required specifications and standards. Delivery across various locations, in line with the needs of individual Contracting Authorities. Suppliers appointed to the Framework are required to deliver services in a reliable, cost-effective and compliant manner, ens
The 18 lots
| Lot | What | Value |
|---|---|---|
| 1 | Asphaltic Concrete Asphaltic Concrete and Asphaltic materials must be supplied in accordance with and comply with National and European Standards, shall be transported and laid in accordance with the requirements of BS 594987:2024. | £33m |
| 2 | Grouted Macadam Grouted Macadam must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following… | £33m |
| 3 | Surface Dressing Surface dressing mut be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following… | £33m |
| 5 | Hot Applied High Friction Surfacing Hot Applied High Friction Surfacing must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1:Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these… | £33m |
| 6 | Cold Applied High Friction Surfacing Cold Applied High Friction Surfacing must be supplied following the process specification: The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these… | £33m |
| 7 | Slurry Seal of Footways Slurry Seal of Footways mut be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The… | £33m |
| 8 | Slurry Seal / Micro Asphalt of Carriageways Slurry Seal/ Micro Asphalt of Carriageways must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1:Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these… | £33m |
| 9 | Carriageway in Full Depth Recycling Carriageway in Full Depth Recycling must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these… | £33m |
| 10 | Carriageway Re-tread Carrigeway re-tread must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1:Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following… | £33m |
| 11 | Captive Shot Blasting - Mechanical Retexturing Captive Shot Blasting - Mechanical Retexturing must be supplied following the process specification: The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these… | £33m |
| 12 | Hydro blasting - Surface Retexturing Hydro blasting - Surface Retexturing must be supplied following the process specification: The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these… | £33m |
| 13 | Patching Patching must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards… | £33m |
| 14 | Alternative Patching Methods: Hot Applied Alternative Patching Methods: Hot Applied must be supplied following the process specification The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these… | £33m |
| 15 | Alternative Patching Methods: Cold Applied Alternative Patching Methods: Cold Applied must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these… | £33m |
| 16 | Road Markings Road Markings must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 1200 with accompanying Notes for Guidance (MCHW 2) in NG1200, sets out the requirements for these materials. The following… | £33m |
| 17 | Surface Preservation: Penetrative Surface Preservation: Penetrative must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.… | £33m |
| 18 | Surface Preservation: Non Penetrative Surface Preservation: Non Penetrative must be supplied following the process specification The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these… | £33m |
| 4 | Glass Fibre Reinforced Surface Dressing Glass Fibre Reinforced Surface Dressing mut be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these… | £33m |
Past groundworks, roads & drainage jobs at The Association of North East Councils Limited
The latest of the 3 contracts in this trade it awarded in the last five years, with who won them.
| Contract | Won by | Value | Bids | Awarded |
|---|---|---|---|---|
| Aggregates, Concrete & Pre-cast Products | Breedon Trading Limited, Hanson Quarry Products Europe Limited | – | – | 8 Oct 2025 |
| Civil Engineering and Infrastructure Works | Applebridge Construction Limited, Balfour Beatty | – | – | 20 Feb 2025 |
| Civil Engineering & Infrastructure Works | Balfour Beatty Civil Engineering Limited, BAM Nuttall Limited | – | – | 20 Feb 2025 |
0 of the 3 groundworks, roads & drainage contracts The Association of North East Councils Limited awarded in the last five years published a bid count: too few to say what is typical.
More: All of The Association of North East Councils Limited’s tenders · Tenders in Gateshead · Tenders in the North East
Tenders and awards from Find a Tender, Contracts Finder, Public Contracts Scotland and Sell2Wales; contracts ending also from councils' own contract registers. Contains public sector information licensed under the Open Government Licence v3.0.