Cyclical Routine Maintenance and Associated Repairs of Foul Water Infrastructure Including Effluent Disposal 2024-2027
A tender from Aster Group Limited.
| Public body | Aster Group Limited |
|---|---|
| Where | Wiltshire, South East |
| Value | £3m |
| Closed | 1 Nov 2024 |
| Published | 3 Jan 2024 |
| How it was bought | Open to any firm: one stage, and anyone can bid. |
| Lots | 7 (parts you can bid for separately) |
| Won by | Cleansing Service Group Limited |
| Awarded for | £540k |
| Awarded on | 1 May 2025 |
| Bids | 9 |
Official notice on Find a Tender ↗
Similar open tenders nearby
This tender has closed. Open tenders like it, in Wiltshire and elsewhere in the South East:
| Tender | Public body | Value | Closes |
|---|---|---|---|
| Natural Flood Management Works - Watlington | South Oxfordshire District Council | £53k | 23 Nov 2026 |
| Reinstatement Services | Thames Water Utilities Limited | £126m | 25 Nov 2026 |
| Allotment Track Repairs | Gosport Borough Council | £65k | 30 Nov 2026 |
| Drainage Works and Resurfacing at Lower Common Road in Eversley | VIVID Housing Ltd | £150k | 2 Dec 2026 |
| Septic Tank Emptying and other Drainage Maintenance Related Services | South Oxfordshire District Council | £90k | 7 Dec 2026 |
| Dredging Tender 2027 | Canal & River Trust | £7m | 16 Dec 2026 |
Get alerts for tenders like this. Start free and get 7 days of Professional, with job alerts, no card. After that, searching every tender stays free with one weekly job alert; daily alerts are from £19 a month.
Get alerts for tenders like thisSearch all tenders like this
What the notice says
Aster Group has approximately 76 foul water infrastructure assets (Sewage Treatment Plants, septic tanks and pumping stations) serving homes not connected to mains drainage. There is an ongoing requirement to undertake routine maintenance of the foul water assets to ensure correct operation and compliance with Environment Agency discharge consents along with the emptying of septic tanks to provide effluent disposal arrangements for properties served by the installations. This procurement is for the successor arrangement to the current contract which comes to an end in early 2025. The requirement is for the provision of scheduled maintenance, non-scheduled maintenance works (where instructed) and provision of a provision of 24-hour, 365-day out of hours and emergency call out service. Full details of the requirements are set out in the Procurement Documents.
The 7 lots
| Lot | What | Value |
|---|---|---|
| 1 | Lot 1 - North Hampshire The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal… | £495k |
| 2 | Lot 2 - South Hampshire The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal… | £1.5m |
| 3 | Lot 3 - East Dorset The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal… | £212k |
| 4 | Lot 4 - West Dorset The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal… | £202k |
| 5 | Lot 5 - Devon & Cornwall The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal… | £140k |
| 6 | Lot 6 - Somerset The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal… | £405k |
| 7 | Lot 7 – Wiltshire The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal… | £68k |
Past groundworks, roads & drainage jobs at Aster Group Limited
The latest of the 2 contracts in this trade it awarded in the last five years, with who won them.
| Contract | Won by | Value | Bids | Awarded |
|---|---|---|---|---|
| CAS-01323-D3P6Z3 - Brittany Close, Marchwood - Bin Stores and Resurfacing | Shield Building Services UK Ltd | £38k | – | 26 Jul 2026 |
| 1 Mount Pleasant, SP11 8AG - Paths & retaining wall | Shield Building Services UK Ltd | £51k | – | 12 Mar 2026 |
0 of the 2 groundworks, roads & drainage contracts Aster Group Limited awarded in the last five years published a bid count: too few to say what is typical.
More: All of Aster Group Limited’s tenders · Tenders in Wiltshire · Tenders in the South East
Tenders and awards from Find a Tender, Contracts Finder, Public Contracts Scotland and Sell2Wales; contracts ending also from councils' own contract registers. Contains public sector information licensed under the Open Government Licence v3.0.