Groundworks, roads & drainageUpcomingThe buyer says it suits small firms

Automated People Mover (APM) Infrastructure

A tender from High Speed Two (HS2) Limited.

Public bodyHigh Speed Two (HS2) Limited
WhereBirmingham, West Midlands
Value£154m
Published21 May 2025
How it's being boughtThe notice doesn't say how it is being bought.
Contract19 Apr 2029 to 19 Jul 2033

Official notice on Find a Tender ↗

Get alerts for tenders like this. Start free and get 7 days of Professional, with job alerts, no card. After that, searching every tender stays free with one weekly job alert; daily alerts are from £19 a month.

Get alerts for tenders like thisSearch all tenders like this

What the notice says

The HS2 Phase One route is from London Euston to the West Midlands and includes the development of high-speed rail stations at London Euston, London Old Oak Common, Birmingham Interchange and Birmingham Curzon Street.The proposed HS2 Birmingham Interchange Station will be situated approximately 20 km to the southeast of Birmingham city centre, close to Birmingham Airport. An Automated People Mover (APM) is required to transport passengers from adjacent areas to the Interchange Station and the wider HS2 network. The APM network will consist of a maintenance facility and four stops detailed herein: I. Interchange Station stop; II. National Exhibition Centre stop; III. Birmingham International Railway Station stop; and IV. Birmingham Airport stop. The APM has been designed as an elevated mass transit system, which will transport passengers between those stops detailed above. The APM route will consist of a 2.3km long viaduct, four stops and a maintenance facility. The Interchange Station Stop is at ground level and the three other stops and maintenance facility are on the viaduct (above ground level). The route has several major crossings to navigate, such as the M42 motorway, the West Coast Main Line (WCML) and Pendigo Lake at the National Exhibition Centre (NEC) site. The key design features of the APM Infrastructure include reinforced central concrete piers, weathered steel deck and escape walkway gratings throughout the entirety of the track. To minimise impact to the existi

Past groundworks, roads & drainage jobs at High Speed Two (HS2) Limited

The latest of the 3 contracts in this trade it awarded in the last five years, with who won them.

ContractWon byValueBidsAwarded
Washwood Heath Depot and Network Integrated Control CentreJoint Venture, Taylor Woodrow infrastructure Limited and Aureos Rail Limited–330 Apr 2026
Track SystemsFerrovial BAM Joint Venture, Colas Rail Limited––15 Jan 2025
HS2 Ltd Engineering Management System (EMS)Siemens Mobility Limited–128 Jan 2025

2 of the 3 groundworks, roads & drainage contracts High Speed Two (HS2) Limited awarded in the last five years published a bid count: too few to say what is typical.

High Speed Two (HS2) Limited's groundworks, roads & drainage contracts ending soon

With who holds them now, over the next 18 months.

ContractHeld byValueEnds
Washwood Heath Depot and Network Integrated Control CentreJoint Venture, Taylor Woodrow infrastructure Limited and Aureos Rail Limited£275m14 Mar 2028

Similar open tenders nearby

Open groundworks, roads & drainage tenders in Birmingham and elsewhere in the West Midlands.

More: All of High Speed Two (HS2) Limited’s tenders · Tenders in Birmingham · Tenders in the West Midlands

Tenders and awards from Find a Tender, Contracts Finder, Public Contracts Scotland and Sell2Wales; contracts ending also from councils' own contract registers. Contains public sector information licensed under the Open Government Licence v3.0.