| Public body | LHC |
|---|---|
| Where | Hillingdon, Wales |
| Value | £80m at most, across everything bought through it |
| Closed | 21 Jun 2024 |
| Published | 15 Aug 2023 |
| How it was bought | Open to any firm: one stage, and anyone can bid. |
| Lots | 31 (parts you can bid for separately) |
| Won by | Gleeds Building Surveying Ltd, Scene Connect Ltd., Severn Wye Energy Agency Ltd, Sureserve Energy Services UK Limited, Turner & Townsend Consulting Limited |
| Awarded on | 18 Feb 2025 |
| Bids | Not published |
Official notice on Find a Tender ↗
Similar open tenders nearby
This tender has closed. Open tenders like it, in Hillingdon and elsewhere in Wales:
| Tender | Public body | Value | Closes |
|---|---|---|---|
| Contract for the Execution of WWP works at Waunarlwydd Phase 2 | City and County of Swansea Council | £2.9m | 23 Nov 2026 |
| Solar PV and Battery Monitoring, Reporting and Visitor Display System | Brecon Beacons National Park Authority | £20k | 30 Nov 2026 |
| Utilities Management and Brokerage Service | ClwydAlyn Housing | £150k | 16 Dec 2026 |
Get alerts for tenders like this. Start free and get 7 days of Professional, with job alerts, no card. After that, searching every tender stays free with one weekly job alert; daily alerts are from £19 a month.
Get alerts for tenders like thisSearch all tenders like this
What the notice says
LHC Procurement Group has awarded for our Retrofit and Decarbonisation Framework - N9. This new Framework will replace LHCPG's successful Energy Efficiency Framework (N8) and our Energy Efficiency Consultancy Framework (N8C). The Retrofit and Decarbonisation Framework will provide our clients with access to a range of retrofit and decarbonisation measures on their approach to achieving net zero targets. This Framework consists of the following workstreams, and lots within them: WORKSTREAM 1 - CONSULTANCY SERVICES Lot 1 - Energy Policy/Strategy and Grant Funding Support Lot 2 - Management Agent / Multi-Disciplinary Consultancy Lot 3 - PAS 2035 (Domestic Building Audits and Heat Decarbonisation Plans) Lot 4 - PAS 2038 (Commercial Building Audits and Heat Decarbonisation Plans) WORKSTREAM 2 - MULTI-DISCIPLINARY WORKS Lot 5 - Multi-Disciplinary Works - 0 to 750K Lot 6 - Multi-Disciplinary Works - 750K to 2.5m Lot 7 - Multi-Disciplinary Works - 2.5m plus WORKSTREAM 3 BUILDING INSULATION Lot 8 - Internal Insulation Lot 9 - Loft Insulation Lot 10 - Cavity Wall Insulation Lot 11 - External Wall Insulation - up to 11m Lot 12 - External Wall Insulation - 11m and Higher Lot 13 - Rainscreen Cladding WORKSTREAM 4 HEATING AND VENTILATION SYSTEMS Lot 14 - Domestic Boiler Based Space Heating Systems Lot 15 - Domestic Renewables Space Heating Systems Lot 16 - Commercial and Communal Heating Systems Lot 17 - District and Network Heating Systems Lot 18 - Electrical Space Heating Systems Lot 19
The 31 lots
| Lot | What | Value |
|---|---|---|
| 14 | Domestic Boiler Based Space Heating Systems LHC Procurement Group have awarded the N9 Retrofit and Decarbonisation Framework. This new Framework replaces LHCPG's successful Energy Efficiency Framework (N8) and our Energy Efficiency Consultancy Framework (N8C). The Framework provides our clients with access to a range of retrofit and… | – |
| 1 | Energy Policy/Strategy and Grant Funding Support This lot provides an integrated approach to supporting organisations in developing and implementing comprehensive energy policies and strategies and additional support in energy efficiency, retrofit and decarbonisation. It focuses on facilitating comprehensive long-term planning, access to… | – |
| 2 | Management Agent / Multi-Disciplinary Consultancy This lot provides for external managing agent / consultancy to oversee and manage the delivery of all aspects of a retrofit project or programme. Working closely with the client, the managing agent will provide a turnkey service to delivering retrofit projects on behalf of the client from… | – |
| 3 | PAS 2035 (Domestic Building Audits and Heat Decarbonisation Plans) This lot covers the supply of PAS 2035 retrofit professionals for providing advice and consultancy services on retrofit projects covered under the PAS 2035 Standards for domestic buildings. Included in this workstream are the tasks of delivering PAS 2035 compliance through various stages, from… | – |
| 4 | PAS 2038 (Commercial Building Audits and Heat Decarbonisation Plans) This workstream focuses on delivering expert consultancy for retrofitting projects in alignment with PAS 2038 standards, specifically targeting non-domestic buildings. The primary goal is to enhance energy efficiency and performance across a variety of structures, from office buildings to… | – |
| 5 | Multi-Disciplinary Retrofit Works 0 to 750k The purpose of this multi-disciplinary lot is to provide LHC clients with a route to approved contractors who can provide a range of retrofit and decarbonisation services under a single contract. Installations may be required for a range of building types, including residential, commercial… | – |
| 6 | Multi-Disciplinary Retrofit Works 750k to 2.5m The purpose of this multi-disciplinary lot is to provide LHC clients with a route to approved contractors who can provide a range of retrofit and decarbonisation works under a single project / contract. Installations may be required for a range of building types, including residential, commercial… | – |
| 7 | Multi-Disciplinary Retrofit Works 2.5m plus The purpose of this multi-disciplinary lot is to provide LHC clients with a route to approved contractors who can provide a range of retrofit and decarbonisation services under a single contract. Installations may be required for a range of building types, including residential, commercial… | – |
| 8 | Internal Insulation This lot encompasses all internal elements of insulation, incorporating internal wall, pipe, tanks, radiators and floor insulation. This specification also includes specific measures for draft proofing for internal elements of the property. Key tasks include supporting the client in the surveying… | – |
| 9 | Loft Insulation This lot covers all aspects of loft insulation, encompassing the insulation of loft spaces, including the roof and associated areas. Installations will involve applying insulation materials to loft spaces, coordinating with structural requirements, and ensuring proper integration with the… | – |
| 10 | Cavity Wall Insulation This lot covers all aspects of cavity wall insulation, focusing on insulating the spaces within building walls. Installations will involve applying insulation materials to internal cavity walls, coordinating with structural requirements, and ensuring proper integration with the building's… | – |
| 11 | External Wall Insulation - up to 11m This lot covers the retrofitting of external wall insulation (EWI) on buildings up to 11 metres in height. Key tasks include the supporting the client in the surveying, assessment, design, selection (of key systems, components, and supply chain), specification development, installation of systems… | – |
| 12 | External Wall Insulation 11m and Higher This lot covers the retrofitting of external wall insulation (EWI) on buildings of 11 metres and over, adhering to the specific requirements and regulations for higher structures. This includes preparing the existing wall, applying insulation materials, and completing the process with suitable… | – |
| 13 | Rainscreen Cladding This workstream covers the assessment, design retrofitting of rainscreen cladding systems. This may be a new cladding system applied to the building or the removal, disposal and replacement of an existing cladding system. Installations will involve preparing the existing wall, applying insulation… | – |
| 15 | Domestic Renewables Space Heating Systems This lot focuses on the design, selection, installation and commissioning of a range of renewable energy based domestic systems for central heating, hot water, and other related applications. Typically this will be air source heat pump and ground source heat pump systems but may also include other… | – |
| 16 | Commercial and Communal Heating Systems This lot focuses on the design, selection, installation and commissioning of communal and commercial systems for central heating, hot water, and other related applications within a range of building types. The systems installed within this lot will typically be large central systems servicing a… | – |
| 17 | District and Network Heating Systems This lot focuses on the design, selection, installation and commissioning of district and network systems for central heating, hot water, and other related applications within a range of building types. The systems installed within this lot will typically be large central systems servicing a… | – |
| 18 | Electrical Space Heating Systems This lot focuses on the design, selection, installation and commissioning of a range of electrical space heating systems. Typically this will be electrical storage heaters, panel heaters, infrared systems and electric radiators but may also include other current electrical heating technologies… | – |
| 19 | Building Ventilation Systems This lot focuses on the design, selection, installation and commissioning of suitable ventilation systems to maintain correct air flow, moisture and humidity control within a range of building types, including residential, commercial, and institutional structures, and encompasses both new builds… | – |
| 20 | Building Management Systems This lot covers the design, selection, installation and commissioning of suitable building management systems to enable building owners to operate and maintain a range of mechanical and electrical systems within their buildings to ensure optimised performance, occupant comfort and minimised energy… | – |
| 21 | Individual Metering This lot covers the installation of a range of retrofitted individual metering systems, aimed at accurately monitoring and managing energy and resource consumption within existing communal heating systems, domestic properties, commercial, and public buildings. The installations of these systems… | – |
| 22 | Solar PV and Electrical Energy Storage Systems (EESS) This lot covers the design, selection, installation and commissioning of a range of solar PV and electrical energy storage systems (EESS). Projects may require both solar PV and EESS or may be the installation of standalone solar PV or EESS systems. Installations may be required for a range of… | – |
| 23 | EV Charging This lot is intended to cover the installation of both AC and DC dedicated electric vehicle supply and charging equipment (EVSE) for the charging of pure electric vehicles (EV) and plug in electric road vehicles as well as extended range vehicles as may be installed or specified. The scope of… | – |
| 24 | Multi-Disciplinary Works - Small Works The multi-disciplinary lots would cater for projects where multiple specialisms or a 'fabric first' approach is required. Potential bidders would need to be able to provide all specialisms either directly or via sub-contractors. This lot will cater for 'small works' to be further explored within… | – |
| 25 | Multi-Disciplinary Works - Minor Works The multi-disciplinary lots would cater for projects where multiple specialisms or a 'fabric first' approach is required. Potential bidders would need to be able to provide all specialisms either directly or via sub-contractors. This lot will cater for 'minor works' to be further explored within… | – |
| 26 | Multi-Disciplinary Works - Major Works The multi-disciplinary lots would cater for projects where multiple specialisms or a 'fabric first' approach is required. Potential bidders would need to be able to provide all specialisms either directly or via sub-contractors. This lot will cater for 'major works' to be further explored within… | – |
| 27 | Energy Policy & Strategy Development Consultancy This lot will allow for consultancy services to be provided to assist organisations to develop a long term energy policy or strategy for development that will encompass the works within this framework. Additional information: The above represents LHC's initial thoughts but will be refined… | – |
| 28 | Grant Funding Support This lot is designed for consultants to assist organisations in accessing and managing funding opportunities, from the early planning stages through to reporting requirements and potential future retention funding. Additional information: The above represents LHC's initial thoughts but will be… | – |
| 29 | Management Agent This lot provides access to consultancies capable of offering full management of retrofit and decarbonisation works for an organisation. Full scope is to be determined through the pre-tender engagement but it is anticipated the consultant would be able to support the client in the application and… | – |
| 30 | PAS 2035 This lot is dedicated to all roles covering the PAS 2035 standard, which is primarily focused on retrofitting of domestic properties. The minimum criteria currently proposed for this lot is that bidders must have accreditation for both the Retrofit Coordinator and Retrofit Assessor roles.… | – |
| 31 | PAS 2038 This lot is dedicated to all roles covering the PAS 2038 standard, which is for non domestic/commercial properties. Those qualified to PAS 2038 are specifically trained to handle the unique challenges and requirements of commercial retrofitting. The minimum criteria currently proposed for this lot… | – |
Past energy, solar & retrofit jobs at LHC
The latest of the 1 contract in this trade it awarded in the last five years, with who won them.
| Contract | Won by | Value | Bids | Awarded |
|---|---|---|---|---|
| Retrofit and Decarbonisation Framework | Baily Garner LLP, Elevate Everywhere Limited | – | – | 18 Feb 2025 |
0 of the 1 energy, solar & retrofit contracts LHC awarded in the last five years published a bid count: too few to say what is typical.
More: All of LHC’s tenders · Tenders in Hillingdon · Tenders in Wales
Tenders and awards from Find a Tender, Contracts Finder, Public Contracts Scotland and Sell2Wales; contracts ending also from councils' own contract registers. Contains public sector information licensed under the Open Government Licence v3.0.