Pd Ag Functional Testing
A tender from UK Fusion Energy Ltd.
| Public body | UK Fusion Energy Ltd |
|---|---|
| Where | Oxfordshire, South East |
| Value | £195k |
| Closed | 29 Jun 2026 |
| Published | 29 May 2026 |
| How it was bought | Open to any firm: one stage, and anyone can bid. |
| Contract | 22 Jul 2026 to 31 Mar 2027 |
| Won by | Not named in the notice |
| Awarded for | £195k |
| Awarded on | 9 Jul 2026 |
| Bids | 3 |
Official notice on Find a Tender ↗
Similar open tenders nearby
This tender has closed. Open tenders like it, in Oxfordshire and elsewhere in the South East:
| Tender | Public body | Value | Closes |
|---|---|---|---|
| STEP Engineering System Partners Procurement | UK Fusion Energy Ltd | £115m | 29 Jan 2027 |
| RSFT Professional construction services | Royal Surrey County Hospital NHS Foundation Trust | – | 26 Nov 2026 |
| H3AT Conformity Assessment Body and Third Party Inspection Services | UK Atomic Energy Authority | £675k | 30 Nov 2026 |
| Detailed Project Design (DPD) for the Hoo Peninsula Heat Network | Medway Council | £100k | 3 Dec 2026 |
| Fall Arrest and Lightning Maintenance | Moat Homes Limited | £400k | 16 Dec 2026 |
Get alerts for tenders like this. Start free and get 7 days of Professional, with job alerts, no card. After that, searching every tender stays free with one weekly job alert; daily alerts are from £19 a month.
Get alerts for tenders like thisSearch all tenders like this
What the notice says
The STEP Fuel Cycle (FC) system requires advanced technologies for hydrogen separation and recovery. The aim of this investigation is to demonstrate the manufacturability of palladium silver membrane assemblies. This will be achieved through conducting annealing trials, brazing trails, and diffusion bonding trials. The effect of these processes on the alloy and its properties will be evaluated through microstructural characterisation and hardness testing, respectively. These techniques will then be used to manufacture membrane assemblies which will be inspected and delivered to UKFE for subsequent testing. The objectives of this investigation are to conduct the following: 1. Tube characterisation, characterise and test the different batches of palladium silver membrane tubes, including microscopy and hardness testing, as received. 2. Annealing trials, refine and execute the process control variables for the annealing of the palladium silver membrane tubes. The effects of annealing on the alloy shall be characterised via microscopy and hardness testing. 3. Brazing trials, refine and execute the process control variables for the brazing of palladium silver membrane tubes to steel fittings. 4. Diffusion bonding trials, develop and execute the process control variables for the diffusion bonding of palladium silver membrane tubes to steel fittings. 5. Destructive testing, to complete the manufacture, inspection, and destructive testing of brazed and diffusion bonded assemblies. Th
Past architecture, surveying & engineering jobs at UK Fusion Energy Ltd
The latest of the 8 contracts in this trade it awarded in the last five years, with who won them.
| Contract | Won by | Value | Bids | Awarded |
|---|---|---|---|---|
| Moveable Shielding Concept Design Study | Ove Arup & Partners Ltd | £70k | – | 26 Oct 2026 |
| Palladium Silver Membranes Tensile and Fatigue Testing | Darvick Ltd | £144k | – | 22 Oct 2026 |
| Fuel Cycle Technical Specification Development | Fusion Fuel Cycles | £130k | – | 17 Sep 2026 |
| Laser Induced Desorption System for Measuring First Wall Retention in STEP | IDOM Consulting, Engineering, Architecture S.A.U. | £74k | 3 | 16 Sep 2026 |
| Design for Longevity- Electrolyser Prototype Design | AqSorption Limited | £120k | 2 | 15 Sep 2026 |
| STEP Programme Reporting Development | Not named | £387k | – | 12 Aug 2026 |
| Third Party Verification and Validation of the STEP Whole Programme Cost Estimate | Kpmg LLP | £175k | 7 | 2 Jun 2026 |
| Magnets Partner Agreement | Not named | £70m | – | 25 Mar 2026 |
3 of the 8 architecture, surveying & engineering contracts UK Fusion Energy Ltd awarded in the last five years published a bid count: too few to say what is typical.
UK Fusion Energy Ltd's architecture, surveying & engineering contracts ending soon
With who holds them now, over the next 18 months.
| Contract | Held by | Value | Ends |
|---|---|---|---|
| Moveable Shielding Concept Design Study | Ove Arup & Partners Ltd | £70k | 25 Feb 2027 |
| Design for Longevity- Electrolyser Prototype Design | AqSorption Limited | £120k | 31 Mar 2027 |
| Laser Induced Desorption System for Measuring First Wall Retention in STEP | IDOM Consulting, Engineering, Architecture S.A.U. | £74k | 31 Mar 2027 |
| Pd Ag Functional Testing | Not named | £195k | 31 Mar 2027 |
| STEP Programme Reporting Development | Not named | £387k | 31 Mar 2027 |
| Fuel Cycle Technical Specification Development | Fusion Fuel Cycles | £130k | 5 Apr 2027 |
More: All of UK Fusion Energy Ltd’s tenders · Tenders in Oxfordshire · Tenders in the South East
Tenders and awards from Find a Tender, Contracts Finder, Public Contracts Scotland and Sell2Wales; contracts ending also from councils' own contract registers. Contains public sector information licensed under the Open Government Licence v3.0.