Design for Longevity- Electrolyser Prototype Design
A tender from UK Fusion Energy Ltd.
| Public body | UK Fusion Energy Ltd |
|---|---|
| Where | Oxfordshire, South East |
| Value | £125k |
| Closed | 14 Aug 2026 |
| Published | 17 Jul 2026 |
| How it was bought | Open to any firm: one stage, and anyone can bid. |
| Contract | 16 Sep 2026 to 31 Mar 2027 |
| Won by | AqSorption Limited |
| Awarded for | £120k |
| Awarded on | 15 Sep 2026 |
| Bids | 2 |
Official notice on Find a Tender ↗
Similar open tenders nearby
This tender has closed. Open tenders like it, in Oxfordshire and elsewhere in the South East:
| Tender | Public body | Value | Closes |
|---|---|---|---|
| STEP Engineering System Partners Procurement | UK Fusion Energy Ltd | £115m | 29 Jan 2027 |
| RSFT Professional construction services | Royal Surrey County Hospital NHS Foundation Trust | – | 26 Nov 2026 |
| H3AT Conformity Assessment Body and Third Party Inspection Services | UK Atomic Energy Authority | £675k | 30 Nov 2026 |
| Detailed Project Design (DPD) for the Hoo Peninsula Heat Network | Medway Council | £100k | 3 Dec 2026 |
| Fall Arrest and Lightning Maintenance | Moat Homes Limited | £400k | 16 Dec 2026 |
Get alerts for tenders like this. Start free and get 7 days of Professional, with job alerts, no card. After that, searching every tender stays free with one weekly job alert; daily alerts are from £19 a month.
Get alerts for tenders like thisSearch all tenders like this
What the notice says
The STEP Fuel Cycle is the subsystem responsible for recovering, purifying and supplying tritium to the STEP fusion reactor. Tritium is present in a variety of forms, phases and compositions, including tritiated water. Vapour-phase electrolysis techniques such as solid-oxide electrolysis have been identified as a suitable technique for processing small quantities of tritiated water. The scope is to deliver the conceptual design of an electrolyser system (electrochemical cell or stack). This includes, but is not limited to, components of the electrolyser: electrolytes, electrodes, interconnects, separators, electrical connections, vessels, structural components, seals, gaskets, heating elements, inlet/outlet pipes, ports, flanges and instrumentation. The scope does not include conceptual design of ‘Balance of Plant’ equipment such as power supplies, pumps, purification stages, boilers, compressors or dehumidifiers. However, the impact on balance of plant equipment must be considered in design decisions for the electrolyser itself. The scope is structured into three sequential phases with interim milestones. These phases will progressively develop technical understanding, validate assumptions, and converge on agreed technical content.
Past architecture, surveying & engineering jobs at UK Fusion Energy Ltd
The latest of the 8 contracts in this trade it awarded in the last five years, with who won them.
| Contract | Won by | Value | Bids | Awarded |
|---|---|---|---|---|
| Moveable Shielding Concept Design Study | Ove Arup & Partners Ltd | £70k | – | 26 Oct 2026 |
| Palladium Silver Membranes Tensile and Fatigue Testing | Darvick Ltd | £144k | – | 22 Oct 2026 |
| Fuel Cycle Technical Specification Development | Fusion Fuel Cycles | £130k | – | 17 Sep 2026 |
| Laser Induced Desorption System for Measuring First Wall Retention in STEP | IDOM Consulting, Engineering, Architecture S.A.U. | £74k | 3 | 16 Sep 2026 |
| STEP Programme Reporting Development | Not named | £387k | – | 12 Aug 2026 |
| Pd Ag Functional Testing | Not named | £195k | 3 | 9 Jul 2026 |
| Third Party Verification and Validation of the STEP Whole Programme Cost Estimate | Kpmg LLP | £175k | 7 | 2 Jun 2026 |
| Magnets Partner Agreement | Not named | £70m | – | 25 Mar 2026 |
3 of the 8 architecture, surveying & engineering contracts UK Fusion Energy Ltd awarded in the last five years published a bid count: too few to say what is typical.
UK Fusion Energy Ltd's architecture, surveying & engineering contracts ending soon
With who holds them now, over the next 18 months.
| Contract | Held by | Value | Ends |
|---|---|---|---|
| Moveable Shielding Concept Design Study | Ove Arup & Partners Ltd | £70k | 25 Feb 2027 |
| Design for Longevity- Electrolyser Prototype Design | AqSorption Limited | £120k | 31 Mar 2027 |
| Laser Induced Desorption System for Measuring First Wall Retention in STEP | IDOM Consulting, Engineering, Architecture S.A.U. | £74k | 31 Mar 2027 |
| Pd Ag Functional Testing | Not named | £195k | 31 Mar 2027 |
| STEP Programme Reporting Development | Not named | £387k | 31 Mar 2027 |
| Fuel Cycle Technical Specification Development | Fusion Fuel Cycles | £130k | 5 Apr 2027 |
More: All of UK Fusion Energy Ltd’s tenders · Tenders in Oxfordshire · Tenders in the South East
Tenders and awards from Find a Tender, Contracts Finder, Public Contracts Scotland and Sell2Wales; contracts ending also from councils' own contract registers. Contains public sector information licensed under the Open Government Licence v3.0.