Laser Induced Desorption System for Measuring First Wall Retention in STEP
A tender from UK Fusion Energy Ltd.
| Public body | UK Fusion Energy Ltd |
|---|---|
| Where | Oxfordshire, South East |
| Value | £75k |
| Closed | 7 Sep 2026 |
| Published | 27 Jul 2026 |
| How it was bought | Open to any firm: one stage, and anyone can bid. |
| Contract | 8 Oct 2026 to 31 Mar 2027 |
| Won by | IDOM Consulting, Engineering, Architecture S.A.U. |
| Awarded for | £74k |
| Awarded on | 16 Sep 2026 |
| Bids | 3 |
Official notice on Find a Tender ↗
Similar open tenders nearby
This tender has closed. Open tenders like it, in Oxfordshire and elsewhere in the South East:
| Tender | Public body | Value | Closes |
|---|---|---|---|
| STEP Engineering System Partners Procurement | UK Fusion Energy Ltd | £115m | 29 Jan 2027 |
| RSFT Professional construction services | Royal Surrey County Hospital NHS Foundation Trust | – | 26 Nov 2026 |
| H3AT Conformity Assessment Body and Third Party Inspection Services | UK Atomic Energy Authority | £675k | 30 Nov 2026 |
| Detailed Project Design (DPD) for the Hoo Peninsula Heat Network | Medway Council | £100k | 3 Dec 2026 |
| Fall Arrest and Lightning Maintenance | Moat Homes Limited | £400k | 16 Dec 2026 |
Get alerts for tenders like this. Start free and get 7 days of Professional, with job alerts, no card. After that, searching every tender stays free with one weekly job alert; daily alerts are from £19 a month.
Get alerts for tenders like thisSearch all tenders like this
What the notice says
UK Fusion Energy Ltd (UKFE) is seeking to appoint a supplier to undertake the concept design of a system capable of in-situ quantification of tritium retention within plasma-facing (first wall) materials for the Spherical Tokamak for Energy Production (STEP) programme. STEP is the UK's flagship fusion energy programme, sponsored by the Department for Energy Security and Net Zero (DESNZ), and aims to design and construct the UK's first prototype fusion power plant capable of demonstrating net energy production, fuel self-sufficiency and a viable route to plant maintenance. UKFE, a wholly owned subsidiary of the United Kingdom Atomic Energy Authority (UKAEA), is responsible for delivering the programme. A key challenge for future fusion power plants is the management of tritium, which serves as a fuel for the deuterium-tritium fusion reaction. Tritium is both radioactive and scarce, making accurate measurement of its retention within plasma-facing components essential to demonstrating fuel self-sufficiency, supporting tritium accountancy, and monitoring the condition of first wall materials throughout plant operation. The successful supplier will develop a concept design for a measurement system capable of operating within the demanding environment of a fusion power plant, taking into account constraints such as neutron radiation, strong magnetic fields, thermal loading, limited installation space, and exposure to radioactive materials. This procurement represents the initial c
Past architecture, surveying & engineering jobs at UK Fusion Energy Ltd
The latest of the 8 contracts in this trade it awarded in the last five years, with who won them.
| Contract | Won by | Value | Bids | Awarded |
|---|---|---|---|---|
| Moveable Shielding Concept Design Study | Ove Arup & Partners Ltd | £70k | – | 26 Oct 2026 |
| Palladium Silver Membranes Tensile and Fatigue Testing | Darvick Ltd | £144k | – | 22 Oct 2026 |
| Fuel Cycle Technical Specification Development | Fusion Fuel Cycles | £130k | – | 17 Sep 2026 |
| Design for Longevity- Electrolyser Prototype Design | AqSorption Limited | £120k | 2 | 15 Sep 2026 |
| STEP Programme Reporting Development | Not named | £387k | – | 12 Aug 2026 |
| Pd Ag Functional Testing | Not named | £195k | 3 | 9 Jul 2026 |
| Third Party Verification and Validation of the STEP Whole Programme Cost Estimate | Kpmg LLP | £175k | 7 | 2 Jun 2026 |
| Magnets Partner Agreement | Not named | £70m | – | 25 Mar 2026 |
3 of the 8 architecture, surveying & engineering contracts UK Fusion Energy Ltd awarded in the last five years published a bid count: too few to say what is typical.
UK Fusion Energy Ltd's architecture, surveying & engineering contracts ending soon
With who holds them now, over the next 18 months.
| Contract | Held by | Value | Ends |
|---|---|---|---|
| Moveable Shielding Concept Design Study | Ove Arup & Partners Ltd | £70k | 25 Feb 2027 |
| Design for Longevity- Electrolyser Prototype Design | AqSorption Limited | £120k | 31 Mar 2027 |
| Laser Induced Desorption System for Measuring First Wall Retention in STEP | IDOM Consulting, Engineering, Architecture S.A.U. | £74k | 31 Mar 2027 |
| Pd Ag Functional Testing | Not named | £195k | 31 Mar 2027 |
| STEP Programme Reporting Development | Not named | £387k | 31 Mar 2027 |
| Fuel Cycle Technical Specification Development | Fusion Fuel Cycles | £130k | 5 Apr 2027 |
More: All of UK Fusion Energy Ltd’s tenders · Tenders in Oxfordshire · Tenders in the South East
Tenders and awards from Find a Tender, Contracts Finder, Public Contracts Scotland and Sell2Wales; contracts ending also from councils' own contract registers. Contains public sector information licensed under the Open Government Licence v3.0.